Projecting and Planning
The capacity, production targets and technical requirements of the facility are determined.
Engineering Studies
System design, equipment selection and infrastructure planning are carried out.
Production and Supply
Production of machinery and equipment is carried out.
Assembly and Installation
The entire system is installed and integrated on site.
Commissioning
The system is tested and made ready for production.